Mains and submains are the highest-value cable on a project, and the easiest to under-measure. We measure each run along its actual route, taking in risers, offsets and tray drops, and price the glands, terminations, supports and cleats as their own items rather than folding them into a metre rate.
Distribution boards are scheduled by rating, way count, form and enclosure type so the supply enquiry can go out immediately, and so board substitutions are visible as a commercial change rather than a silent one.
Supply intake, metering, main switch and any generator or UPS interface measured as discrete items.
Submains measured along the real route including riser drops, offsets and containment transitions.
Boards listed by rating, way count, form, enclosure and protection device, ready for enquiry.
Busbar trunking, tap-off units and rising main sections measured by length and by unit.
Tray, ladder, basket, trunking, brackets and cleats measured with fixing centres allowed for.
Glands, lugs, shrouds and terminations counted per cable end rather than absorbed into the cable rate.
Send us your drawings and specification, or just a description of the scope. Our estimating team will come back with an itemised quotation and a realistic delivery date.