A bill of quantities has to survive being handed to somebody else. Ours are structured by system and by level, with consistent descriptions, units and item coding, so your procurement team, your subcontractors and your client are all reading the same document.
Every item is cross-read against the specification before it is written, which is where most cost surprises are caught — specified fitting brands, cable types, containment standards and testing scope that the drawings alone never show.
Bill items generated directly from the Planswift measurement so the BOQ and the takeoff can never drift apart.
Each item checked against the written specification for brand, rating, cable type and installation standard.
Section, subsection and item numbering applied consistently so the bill can be re-sorted and compared without breaking.
Rates, quantities and totals linked by formula, not typed, so a rate change flows through the whole bill instantly.
Supplied blank for your own pricing, or fully priced against agreed rates — or both, as separate tabs.
Section collections rolling up into a single summary page formatted for direct inclusion in a submission.
Send us your drawings and specification, or just a description of the scope. Our estimating team will come back with an itemised quotation and a realistic delivery date.